The excavator made it! We were able to make lots of progress after finally getting the excavator onsite and organizing its work. We installed about 500 feet of pipe and worked on valve boxes. The hauling of sand bedding around is strenuous but at least we don't have to dig!


This team continues to push forward to get water flowing. I'd like to take the time to introduce everyone.


- Rena is a water resources engineer with Stantec and is the co-lead for the project

- Phil is a retired structural engineer with Stantec and designed the well building and bridge crossing

- Brian is a retired water/wastewater engineer with Stanley and is our original REIC and water resources expert.

- Jackie is a civil engineer with SRF and designed the pipe watermain and future network.

- Chris is a geotechnical engineer at Stanley and is the other co-lead.


Chris Larson - EWB-MN Chuchurras Project Lead


 